Saturday, March 10, 2007

What Can I Do To Dissolve Hematoma

Estrich, Spitzbodenausbau, Wandfliesen und Mehrspartenhauseinführung

Thursday 08 March 2007

multi-branch building entry

was installed on Thursday the introduction of multi-branch house. Power and phone are not yet connected, however. This will probably happen in the next week. On the road, the corresponding lines are already set free.



Tuesday 06 March 2007

wall tiles

On Tuesday, the tile started the wall tile glue. By Thursday they were done and the tiles have been grouted to.



Saturday 03 March 2007

loft development

on Saturday, Sunday and Monday, we have increased the loft. For this purpose, had first glass wool as an insulating material to be clamped between the rafters. Then, create a climate stretched across the rafters of the roof membrane and the so-called counter battens and battens. For the floor we started construction lumber across screwed over the collar beam and laid out a layer of OSB. Now only the drywall missing among the slopes and at the gable ends, but we have to wait until the electricians, the antenna cable in die Leerrohre eingezogen haben. An dieser Stelle noch einmal vielen Dank an meine lieben Eltern und an Mario, ohne die die Realisierung dieses Projektes unmöglich gewesen wäre.

Montag, 26. Februar 2007

Estrich

Am Montag und Dienstag wurde der Estrich im Erdgeschoss und Dachboden erstellt. Wir durften dann ein paar Tage lang das Haus nicht betreten und haben das Ergebnis am Wochenende das erste mal bei Tageslicht gesehen.