yesterday at 22.12. was created as planned, the ground floor ceiling. When we arrived around 10:00 clock to the site, just finished, the concrete elements with a crane in the open winter tent lifted and placed on the finished ground floor walls. Should then be a further layer of concrete to be poured.
Saturday, December 23, 2006
Pregnancy Dermatitis Images
Erdgeschossdecke
yesterday at 22.12. was created as planned, the ground floor ceiling. When we arrived around 10:00 clock to the site, just finished, the concrete elements with a crane in the open winter tent lifted and placed on the finished ground floor walls. Should then be a further layer of concrete to be poured.
yesterday at 22.12. was created as planned, the ground floor ceiling. When we arrived around 10:00 clock to the site, just finished, the concrete elements with a crane in the open winter tent lifted and placed on the finished ground floor walls. Should then be a further layer of concrete to be poured.
Thursday, December 21, 2006
What Hydrogen Peroxide Is Used For Face Bleaching
Erdgeschoss (fast) fertig
the masons to build really fast. Today at 11:00 clock already was a large part of the walls of the ground floor. You get now a very good idea of how it will look the finished floor. The quality of the work believe it's almost unbelievable how quickly clean work is done. The pace should the builders have put the ground floor finished today. Thus, tomorrow as planned, the ground floor ceiling cast.
the masons to build really fast. Today at 11:00 clock already was a large part of the walls of the ground floor. You get now a very good idea of how it will look the finished floor. The quality of the work believe it's almost unbelievable how quickly clean work is done. The pace should the builders have put the ground floor finished today. Thus, tomorrow as planned, the ground floor ceiling cast.
Wednesday, December 20, 2006
Nuptial Agreement Sample
Die Maurer haben begonnen
Once established in the last two days, the scaffold and the material was delivered, the builders have now started work. When we arrived around 10:30 clock to the site already had the four corners of our ground floor in work. Now our house is slowly but surely taking shape. The wall built of pieces look neat and well organized site makes an impression.
the tent has been accumulating moisture, so that it drips from the ceiling. It appeared to us in a tent not much warmer than outside, but the workers assured us that this was more pleasant than to build in this time of year in the open. On Friday will be cast on the ground floor ceiling and to this end, the tent opens so dass dann auch die Nässe entweichen kann.
Once established in the last two days, the scaffold and the material was delivered, the builders have now started work. When we arrived around 10:30 clock to the site already had the four corners of our ground floor in work. Now our house is slowly but surely taking shape. The wall built of pieces look neat and well organized site makes an impression.
the tent has been accumulating moisture, so that it drips from the ceiling. It appeared to us in a tent not much warmer than outside, but the workers assured us that this was more pleasant than to build in this time of year in the open. On Friday will be cast on the ground floor ceiling and to this end, the tent opens so dass dann auch die Nässe entweichen kann.
Friday, December 15, 2006
Pirates Of Carribean Jesse Jane
Thursday, December 14, 2006
Pokemon Leaf Green Vba Rom Mac
Lage des Grundstücks
Wenn Ihr Euch mal ein Bild von der Lage unseres Grundstücks und des zu errichtenden Hauses machen wollt, so besucht einfach die folgende Webseite.
Unser
Grundstück (blau) und Haus (rot) bei Google Maps.
(benötigt JavaScript)
It is certainly not exact because I do not have the coordinates, but I think you can do so a better image.
Wenn Ihr Euch mal ein Bild von der Lage unseres Grundstücks und des zu errichtenden Hauses machen wollt, so besucht einfach die folgende Webseite.
Unser
Grundstück (blau) und Haus (rot) bei Google Maps.
(benötigt JavaScript)
It is certainly not exact because I do not have the coordinates, but I think you can do so a better image.
Optim Steam Mop Price
Aufbau des Winterzelts
Today, the workers began to set up the tent for the winter construction site. Already early in the morning was a large crane on site. At 10:30 clock the roof element of the first section was mounted. At the second visit the site at 13:30 clock was then mounted the entire first part and was just released on the rails in the correct position. Mr. Reckord we had previously stated that you can move the individual pieces later as needed.
Ling Fey, our youngest daughter told me tonight that the small tent was. Let's see what she says tomorrow, when the whole tent is.
Today, the workers began to set up the tent for the winter construction site. Already early in the morning was a large crane on site. At 10:30 clock the roof element of the first section was mounted. At the second visit the site at 13:30 clock was then mounted the entire first part and was just released on the rails in the correct position. Mr. Reckord we had previously stated that you can move the individual pieces later as needed.
Ling Fey, our youngest daughter told me tonight that the small tent was. Let's see what she says tomorrow, when the whole tent is.
Tuesday, December 12, 2006
Lorena Erera Al Desnudo
Rückblick
I summarize here, even the recent events together since the start of construction.
Monday 04 December 2006
Construction
The Reference Line is created using modern instrumentation.
Tuesday 05 December 2006
meeting with construction manager
We meet Mr Nienaber Reckord of construction on our property. He tells us that the strings of the string framework the exact location of the house and level the top Mark the floor on the ground floor. Mr. Reckord also tells us the schedule until Christmas. The ground work will be done in the same week and early next week to the base plate to be created. Subsequently, the tent for the winter construction site is set up. If all goes as planned, it stands at 22.12. the ground and first floor ceiling is completed. We are perfectly happy that our construction annnimmt now taking shape. In the afternoon, I show the children how to plot with the stake. The children are absolutely thrilled and look forward to their own children and the garden.
Thursday 07. December 2006
ground work
Even as I at our daughter shortly before 8 clock go to school, I can see that they are working diligently on our property. First, the soil is pushed to the side and then filled with gravel.
Friday 08 December 2006
final ground work
On this day, the dirt was compacted well. When I was in the night before at the site stopped by, I had the impression that the filling material up to level of the Line, so the top floor of the ground floor, enough. On Friday afternoon, the material was then compressed to the point that a significant gap between the top of the gravel and the cords of the line skeleton was found.
I summarize here, even the recent events together since the start of construction.
Monday 04 December 2006
Construction
The Reference Line is created using modern instrumentation.
Tuesday 05 December 2006
meeting with construction manager
We meet Mr Nienaber Reckord of construction on our property. He tells us that the strings of the string framework the exact location of the house and level the top Mark the floor on the ground floor. Mr. Reckord also tells us the schedule until Christmas. The ground work will be done in the same week and early next week to the base plate to be created. Subsequently, the tent for the winter construction site is set up. If all goes as planned, it stands at 22.12. the ground and first floor ceiling is completed. We are perfectly happy that our construction annnimmt now taking shape. In the afternoon, I show the children how to plot with the stake. The children are absolutely thrilled and look forward to their own children and the garden.
Thursday 07. December 2006
ground work
Even as I at our daughter shortly before 8 clock go to school, I can see that they are working diligently on our property. First, the soil is pushed to the side and then filled with gravel.
Friday 08 December 2006
final ground work
On this day, the dirt was compacted well. When I was in the night before at the site stopped by, I had the impression that the filling material up to level of the Line, so the top floor of the ground floor, enough. On Friday afternoon, the material was then compressed to the point that a significant gap between the top of the gravel and the cords of the line skeleton was found.
Throat Cancer Colours
Fertige Bodenplatte
After it was dark yesterday when we arrived back at the construction site, we could still admire the finished floor slab in bright sunshine. The picture shows the bottom plate with the connections and discharges. In the background is the house of our neighbors to see, another built by the Viebrockhaus Nienaber Bau GmbH
Today, more nothing happened on the site, but this is the planning, since the base plate needs to dry first.
After it was dark yesterday when we arrived back at the construction site, we could still admire the finished floor slab in bright sunshine. The picture shows the bottom plate with the connections and discharges. In the background is the house of our neighbors to see, another built by the Viebrockhaus Nienaber Bau GmbH
Today, more nothing happened on the site, but this is the planning, since the base plate needs to dry first.
Monday, December 11, 2006
What Kind Of Bow Does Jessica Biel Use In Blade
Erstellung der Bodenplatte
Today is the floor slab is poured for our house. When we clock at 8:30 at the construction site stopped by, the workers were just busy digging a trench for the connections. The multi-branch building entry and the tubes for the bottom lines of geothermal probes have already been created.
Today is the floor slab is poured for our house. When we clock at 8:30 at the construction site stopped by, the workers were just busy digging a trench for the connections. The multi-branch building entry and the tubes for the bottom lines of geothermal probes have already been created.