I summarize here, even the recent events together since the start of construction.
Monday 04 December 2006
Construction
The Reference Line is created using modern instrumentation.
Tuesday 05 December 2006
meeting with construction manager
We meet Mr Nienaber Reckord of construction on our property. He tells us that the strings of the string framework the exact location of the house and level the top Mark the floor on the ground floor. Mr. Reckord also tells us the schedule until Christmas. The ground work will be done in the same week and early next week to the base plate to be created. Subsequently, the tent for the winter construction site is set up. If all goes as planned, it stands at 22.12. the ground and first floor ceiling is completed. We are perfectly happy that our construction annnimmt now taking shape. In the afternoon, I show the children how to plot with the stake. The children are absolutely thrilled and look forward to their own children and the garden.
Thursday 07. December 2006
ground work
Even as I at our daughter shortly before 8 clock go to school, I can see that they are working diligently on our property. First, the soil is pushed to the side and then filled with gravel.
Friday 08 December 2006
final ground work
On this day, the dirt was compacted well. When I was in the night before at the site stopped by, I had the impression that the filling material up to level of the Line, so the top floor of the ground floor, enough. On Friday afternoon, the material was then compressed to the point that a significant gap between the top of the gravel and the cords of the line skeleton was found.