were today installed the windows and doors. When I was at the construction site around 8:30 clock stopped by just met a craftsman with the windows and shutters. The front doors (one for the main entrance and one for the side entrance) had already been delivered. When I clock again at 18:30 came to the site, the workmen had just finished with the installation of all windows and doors.
0 comments:
Post a Comment