Auf der Höhe des bereits gesicherten Hanges wurden weiter fleißig Holes in various sizes and depths drilled and then filled with concrete lots now. And horizontally into the slope was re-drilled. Now it is
so exciting as it goes next week and also a brief speculative look at the beginning of the structural work at this location was already allowed.
photos of the last days
0 comments:
Post a Comment